WhatsApp
backNews Article

ACME Solar's Subsidiary Wins 220 MW Solar and BESS Project Contract with RUMSL in Madhya Pradesh

Project features 25-year tenure, Rs. 2.764 per unit tariff, targeting commercial operation by December 31, 2027

ACME Solar Holdings Ltd's wholly owned subsidiary executed a Power Purchase Agreement to develop a 220 MW Solar with Battery Energy Storage System project at Morena Solar Park, Madhya Pradesh, with a 25-year tenure and tariff of Rs. 2.764 per unit, scheduled for commercial operation by December 31, 2027.

1 day ago|ACMESOLAR+1.51%
ACME Solar Holdings Limited544283ACMESOLAROrder Wins

ACME Solar Holdings Limited

Order Wins

ACME Greentech Sixteen Private Limited, a fully owned subsidiary of ACME Solar Holdings Limited, signed a Power Purchase Agreement with Rewa Ultra Mega Solar Limited to develop a 220 MW Solar with Battery Energy Storage System project at Morena Solar Park, Madhya Pradesh.

The project scope includes installation of a 220 MW Solar with Battery Energy Storage System (BESS) unit at Morena Solar Park.

The Power Purchase Agreement sets a tariff of Rs. 2.764 per unit for a project tenure of 25 years starting from the PPA signing date.

The Scheduled Commercial Operation Date (SCOD) for the project is set as December 31, 2027.

This contract was awarded by Rewa Ultra Mega Solar Limited, a domestic entity, and is not related party transaction nor involves promoter or group interests.

ACME Solar disclosed this contract under SEBI Listing Regulations as a voluntary disclosure to keep stakeholders informed.

Highlights

  • Contract signed by ACME Solar’s wholly owned subsidiary for 220 MW Solar and BESS project.
  • Project location: Morena Solar Park, Madhya Pradesh.
  • Tariff fixed at Rs. 2.764 per unit under the PPA.
  • Scheduled Commercial Operation Date is December 31, 2027.
  • The PPA tenure is 25 years from signing date.
  • Contract awarded domestically by Rewa Ultra Mega Solar Limited.

Key Data Snapshot

Project Capacity220 MW
Project TypeSolar with Battery Energy Storage System (BESS)
Project LocationMorena Solar Park, Madhya Pradesh
TariffRs. 2.764 per unit
Scheduled Commercial Operation Date (SCOD)December 31, 2027
Project Tenure25 years from PPA signing date
Contracting EntityRewa Ultra Mega Solar Limited
Subsidiary executing PPAACME Greentech Sixteen Private Limited

What happened

  • ACME Greentech Sixteen Private Limited executed a Power Purchase Agreement (PPA) with Rewa Ultra Mega Solar Limited for a 220 MW Solar with Battery Energy Storage System project.
  • The project will be located at Morena Solar Park in Madhya Pradesh.
  • This follows ACME Solar Holdings Limited's earlier disclosures about the project.

Key details

  • The tariff for the power supply is set at Rs. 2.764 per unit under the PPA.
  • The Scheduled Commercial Operation Date (SCOD) is fixed as December 31, 2027.
  • The project tenure agreed is 25 years from the date of PPA signing.
  • Rewa Ultra Mega Solar Limited is the domestic contracting authority.
  • There is no promoter interest or related party involvement in the PPA.

Transaction details

  • The contract covers development, operation, and power supply of the 220 MW Solar with Battery Energy Storage System (BESS) unit.
  • This is a domestic power purchase agreement executed under SEBI Listing Regulations requirements.
  • This disclosure is voluntary to keep investors updated on significant contracts.

More News on Order Wins

View all

Latest corporate announcements and market updates in Order Wins.

View all news
ACME Solar's Subsidiary Wins 220 MW Solar and BESS | Stockk News