ACME Solar Holdings Commissions 155.71 MW Renewable Energy Project With Battery Storage in Rajasthan
Project includes 100.02 MW solar capacity and 55.69 MW battery system, commercial operation from November 21, 2026, under PPA with NTPC Limited
ACME Solar Holdings Limited, through its subsidiary ACME Sigma Urja Private Limited, commissioned 155.71 MW of Firm and Dispatchable Renewable Energy capacity, including a 100.02 MW solar plant and 55.69 MW / 265.38 MWh battery energy storage system, at its FDRE project in Rajasthan on November 19, 2026, with commercial operation scheduled from November 21, 2026. The project is connected to Neemuch Pooling Station and has a Power Purchase Agreement with NTPC Limited.
ACME Solar Holdings Limited
Capacity Expansion
ACME Solar Holdings Limited announced commissioning 155.71 MW of its Firm and Dispatchable Renewable Energy project in Rajasthan, comprising a 100.02 MW solar plant and a 55.69 MW battery energy storage system, on November 19, 2026, with commercial operations starting from November 21, 2026.
The project is located at Village Kharnai, Tehsil Rawatbhata, District Chittorgarh, Rajasthan, connected to the Neemuch Pooling Station.
The total contracted capacity of the FDRE project is 250 MW, with 155.71 MW commissioned currently by ACME Sigma Urja Private Limited, a wholly owned subsidiary of ACME Solar Holdings.
The battery energy storage system installed has a capacity of 55.69 MW and an energy storage of 265.38 MWh, enhancing the dispatchability of the renewable energy produced.
A Power Purchase Agreement is in place with NTPC Limited, securing the sale of electricity generated by this project.
Highlights
- Commissioning of 155.71 MW capacity including 100.02 MW solar and 55.69 MW battery storage system.
- Project located in Kharnai Village, Rajasthan, connected to Neemuch Pooling Station.
- Commercial operation date set for November 21, 2026.
- Power Purchase Agreement signed with NTPC Limited.
- Total contracted capacity of the FDRE project is 250 MW.
Key Data Snapshot
What happened
- ACME Solar Holdings Limited commissioned 155.71 MW of the FDRE project through its wholly owned subsidiary ACME Sigma Urja Private Limited on November 19, 2026.
- The commissioned capacity includes 100.02 MW of solar power and a 55.69 MW / 265.38 MWh battery energy storage system.
- Commercial operation is scheduled to begin from November 21, 2026.
- The project is part of a larger FDRE contracted capacity of 250 MW located in Chittorgarh, Rajasthan.
- The facility is connected to the Neemuch Pooling Station.
Key details
- Power Purchase Agreement for the project has been signed with NTPC Limited.
- The battery energy storage system enhances the dispatchability of the renewable energy generated from the solar plant.
- The project supports ACME Solar’s strategic expansion in the renewable energy sector.
Highlights
- Commissioning of 155.71 MW capacity including 100.02 MW solar and 55.69 MW battery storage system.
- Project located in Kharnai Village, Rajasthan, connected to Neemuch Pooling Station.
- Commercial operation date set for November 21, 2026.
- Power Purchase Agreement signed with NTPC Limited.
- Total contracted capacity of the FDRE project is 250 MW.
Disclosures
- Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 - Regulation 30
More News on Capacity Expansion
View allLatest corporate announcements and market updates in Capacity Expansion.
Juniper Green Energy Raises Operational Capacity to 2,952 MWp with Commissioning of 108.50 MWp Solar Component in Hybrid Project
Juniper Green Energy Limited announced that its wholly owned subsidiary Juniper Green ETA Five Private Limited has commissioned 108.50 MWp of solar capacity as part of a 75 MW wind-solar hybrid power project with Maharashtra State Electricity Distribution Company Limited on November 19, 2026.
Read Full StoryJuniper Green Energy Subsidiary Commissions 94.77 MWh Battery Energy Storage System on November 19, 2026
Juniper Green Stellar Private Limited, a wholly owned subsidiary of Juniper Green Energy Limited, has commissioned a 94.77 MWh Battery Energy Storage System on November 19, 2026. This capacity is currently deployed as a merchant capacity with flexibility to convert to a long-term Power Purchase Agreement in the future.
Read Full StoryThe Sandur Manganese & Iron Ores Limited Commits ₹280 Crore to Build Deogiri Beneficiation Plant with Up to 1.7 MTPA Upgraded Iron Ore Output
The Sandur Manganese & Iron Ores Limited plans to invest around ₹280 crore in a beneficiation plant at Deogiri to process iron ore from its KTIO and Deogiri mines. The facility is designed to upgrade iron content from about 50% to over 60%, with an initial output of 1.0-1.2 million tonnes per annum and potential to reach 1.7 million tonnes.
Read Full Story